§ 250.195. What notification does BSEE require on the production status of wells?
106 words·~1 min read·
/us/cfr/t30/s§ 250.195·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
You must notify the appropriate BSEE District Manager when you successfully complete or recomplete a well for production. You must:
(a)Notify the District Manager within 5 working days of placing the well in a production status. You must confirm oral notification by telefax or e-mail within those 5 working days.
(b)Provide the following information in your notification:
(1)Lessee or operator name;
(2)Well number, lease number, and OCS area and block designations;
(3)Date you placed the well on production (indicate whether or not this is first production on the lease);
(4)Type of production; and
(5)Measured depth of the production interval.